Got my Altronix supply up and running again, I want to connect the supervisory contacts. On the Altronix board are 6 connections, 3 (NO, C, NC) for Low Battery and 3 (NO, C, NC) for AC fail.
Elk manual says to use the Power Supervisory zone type (32), then wire to short on Low Battery and Open...